翻訳と辞書 |
MBTA Commuter Rail Maintenance Facility : ウィキペディア英語版 | MBTA Commuter Rail Maintenance Facility
The MBTA Commuter Rail Maintenance Facility (often known by its former name of Boston Engine Terminal) is the primary train maintenance repair facility for the MBTA Commuter Rail system. It is located in the Inner Belt area of Somerville, Massachusetts, near North Station in Boston. The present Commuter Rail Maintenance Facility was built in 1995, replacing the Boston Engine Terminal which was built by the former Boston and Maine Railroad. Three small platforms on asphalt crossings serve as flag stops for MBTA employees only. One platform serves the Fitchburg Line, another the Lowell Line, and a third the Haverhill Line and Newburyport/Rockport Line (which split a mile north of the CRMF). It has been viewed as a possible location for a light rail maintenance facility for the under-construction Green Line Extension. ==References==
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「MBTA Commuter Rail Maintenance Facility」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|